![]() |
| Zeebrugge 08 April 2007 |
|
Name |
CHELTENHAM |
|
Type |
Liquefied Gas tanker |
|
IMO-number |
9005015 |
|
Call sign |
C6JC6 |
|
Flag |
Bahamas |
|
Port of registry |
Nassau |
|
GT |
3.376 t Suez: 3683,88 t Panama: 3738,51 t |
|
DWT |
4.318 t on 5,76 m summer draft |
|
NT |
1.013 t |
|
Length |
99,60 m overall |
|
Breadth |
15,80 m moulded |
|
Draught |
5,75 m |
|
Forecastle |
13,94 m |
|
Poop |
19,50 m |
|
Keel to masthead |
32,63 m |
|
Distance bow to bridge |
75,00 m |
|
Depth |
7,30 m moulded |
|
Speed |
14,64 knots |
|
Built |
1990 |
|
Keel laid |
16.04.1990 |
|
Launch date |
23.06.1990 |
|
Date of completion |
16.10.1990 |
|
Builder |
Kanrei Shipbuilding Co., Ltd. |
|
Yard number |
346 |
|
Hull material |
Shipbuilding steel (standard) |
|
Hull type |
Double bottom |
|
Watertight bulkheads |
6 |
|
Continuous decks |
1 |
|
Main engine |
1x Mitsubishi Akasaka UEC 371 LA - 2 stroke single acting 6 cylinder 370 x 880 mm diesel engine - 2.425 kW / 3.300 bhp at 195,0 rpm Year of manufacture: 1990 Manufacturer: Akasaka Diesels, Ltd. |
|
Number of screws |
1x Solid propeller (keyless) - aft at 195 rpm |
|
Boilers |
1x Steam boiler, oil fired - 7,0 bar Heating surface: 7,2 m² 1x Steam boiler, exhaust gas heated Year of manufacture: 1990 |
|
Electric Installations |
1x Plant 440 V - 600 kVA 1x Plant 440 V - 5 kVA |
|
Generators |
2x Main diesel generatorsets each 300 kVA |
|
Emergency generator |
1x 5 kVA |
|
Compressed air receivers |
1x Receiver 80 litres - 30 bar 2x Receivers each 1.100 litres - 25 bar |
|
Number of cargo tanks |
2 |
|
Cargo capacity |
3.208 m³ |
|
Largest cargo tank |
1.604 m³ |
|
Cargo pumps |
2x Deepwell cargo pumps |
|
Anchor equipment |
3x Anchors weight each 2.640 kg Chain length: 467,50 m |
|
Lifting equipment |
2x Cranes - SWL 0,9 t each |
|
Manager |
Bernhard Schulte Shipmanagement (Deutschland) GmbH & Co. KG |
|
Owner |
Beteiligungsgesellschaft LPG Tankerflotte mbH & Co. KG |
