![]() |
|
Westerschelde 23 July 2020 |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
|||||
| Westerschelde 23/07/20 | Westerschelde 08/04/12 | Westerschelde 08/04/12 | Westerschelde 08/04/12 | Rotterdam 12/08/20 | Rotterdam 12/08/20 | |||||
![]() |
![]() |
|||||||||
| Westerschelde 23/07/20 | Zeebrugge 25/10/24 | |||||||||
|
Name |
MPI RESOLUTION |
|
Previous names |
2003 - 07/2004 Mayflower Resolution 07/2004 - 04/2009 Resolution |
|
Type |
Self-elevating unit offshore support wind turbine installation unit crane |
|
IMO-number |
9260134 |
|
Call sign |
PCJM |
|
Flag |
The Netherlands |
|
Port of registry |
Rotterdam |
|
Previous flags |
2003 - 2007 Isle of Man, Douglas 2007 - 2010 Cyprus, Limassol - call sign: C4SN2 2010 - 2018 The Netherlands, Breskens - Call sign: PCJM |
|
GT |
14.310 t |
|
DWT |
Max: 4.875 t at 4,30 draft |
|
Lightship |
9.772 t |
|
Number of 20ft containers |
4.294 t |
|
Length |
130,00 m overall 123,91 m between perpendiculars |
|
Breadth |
38,00 m extreme |
|
Draught |
4,31 m 3,40 m minimum operational depth |
|
Air draft |
68,20 m |
|
Depth |
8,00 m moulded |
|
Speed |
11,0 knots |
|
Built |
2003 |
|
Keel laid |
20/05/2002 |
|
Launch date |
07/11/2002 |
|
Date of completion |
05/12/2003 |
|
Builder |
Shanhaiguan Shipbuilding Industry Qinhuangdao China |
|
Yard number |
TIV-1 |
|
Hull material |
Steel |
|
Main engine |
4x ABB AMA4xxLx engines 1.900 kW / 2.500 hp each powering 4x Aquamaster US 205/ 3850A Azimuth thrusters each 1.500 kW / 2.000 hp |
|
Generators |
4x Mitsubishi S16R diesel generatorsets Builder: Mitsubishi Equipment Europe 2x Wärtsilä 6L20 diesel generatorsets Builder: Wärtsilä Finland Oy |
|
Bow thruster |
3x ABB AMA400L6L diesel engines powering 3 Kamewa TT1650 controllable pitch bow thrusters each 700 KW / 940 hp |
|
Maximum cargo area |
3.200 m² |
|
Maximum deck loading |
10,00 t/m² |
|
Number of jack-up legs |
6 Length of legs: 71,80 m |
|
Jacking system |
Powered by Gusto’s patented double cylinder jacking system: Lifting Speed: 30m/h Jacking Capacity: 2.850 t/leg Pre-drive Capacity: 4.440 t/leg Holding Capacity: 5.700 t/leg |
|
Tank capacities |
Water ballast: 8.674,4 m³ |
|
Cargo gear |
Main Hoist - SWL 600 t @ 25,00 m radius (Jacked up fixed to fixed) Auxiliary Hoist - SWL 30 t @ 92,5 m (Jacked up) Auxiliary crane - SWL 50 t @ 35,00 m radius |
|
Accommodation |
70 Berths Double cabins: 21 Single canines: 28 Five Offices Hospital Conference Room Coffee Shop Male and Female Locker Rooms/WC's Galley & Stores Laundry Mess Room Gymnasium |
|
Manager |
Van Oord Ship Management B.V. Schaardijk 211 3063 NH Rotterdam The Netherlands |
|
ISM manager |
Van Oord Offshore UK Ltd. |
|
Previous managers |
2003 - 2004 MPI Offshore Limited 2004 - 2007 Marine Projects International Ltd. 2007 - 2018 MPI Offshore Ltd.,Breskens - The Netherlands |
|
Owner |
Van Oord Installatie Materieel I B.V. The Netherlands |
|
Registered owner |
2003 - 2004 MPI Offshore Limited 2004 - 2006 Marine Projects International Ltd. 2006 - 2007 Southern Express BV 2007 - 2018 Resolution Shipping Ltd. |
|
Remarks |
The world’s first purpose built vessel for installing offshore wind turbines, foundations and transition pieces |
|
Latest data adjustment |
16 February 2021 |








