![]() |
|
Westerschelde 06 August 2015 |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
|||||
| Westerschelde 05/08/15 | Westerschelde 19/01/17 | Westerschelde 05/09/19 | Terneuzen 11/07/19 | Terneuzen 11/07/19 | Westerschelde31/08/17 | |||||
|
Name |
EM KEA |
|
Previous names |
2007 - 06/2012 Cap Norte 06/2012 - 2015 Cap Egmont |
|
Type |
Cellular containership |
|
IMO-number |
9334351 |
|
Call sign |
A8NN6 |
|
Flag |
Liberia |
|
Port of registry |
Monrovia |
|
GT |
35.824 Suez: 37.438,49 |
|
DWT |
Summer: 42.166 t |
|
NT |
15.130 Suez: 31.648,82 Panama: 29.660 |
|
Displacement |
57.251 t |
|
Light ship |
15.086 t |
|
Number of 20ft containers |
In hold: 1.408 On deck: 1.700 Total: 3.108 |
|
Number of 40ft containers |
In hold 684 + 40 TEU On deck: 850 |
|
Reefer capacity |
500 |
|
Length |
220,32 m overall 210,20 m between perpendiculars 212,75 m registered |
|
Breadth |
32,24 m moulded |
|
Draught |
Summer: 12,15 m 7,30 m light ship |
|
Freeboard |
26,86 m |
|
Depth |
18,70 m moulded |
|
Speed |
22,3 knots |
|
Built |
2007 |
|
Keel laid |
19/02/2007 |
|
Launch date |
30/06/2007 |
|
Delivery date |
12/11/2007 |
|
Builder |
Stocznia Szczecinska Nowa Sp. z o.o. ul. Hutnicza 1 71-642 Szczecin Republic of Poland |
|
Yard number |
B178-I/20 |
|
Hull material |
Shipbuilding steel (standard) Higher tensile steel |
|
Hull type |
Double bottom, continuous from peak to peak bulkhead |
|
Watertight bulkheads |
8 |
|
Continuous decks |
1 |
|
Main engine |
1x MAN-B&W 7K80MC-C - 2 stroke 7 cylinder 800 x 2.300 mm combustion engine 26.270 kW at 104,0 rpm Year of manufacture: 2007 Manufacturer: H. Cegielski-Poznan S.A. ul. 28 Czerwca 1956 223/229 60-965 Poznan Republic of Poland |
|
Propellers |
1x Solid propeller (keylass) - aft at 104,0 rpm |
|
Boilers |
1x Steam boiler, oil fired - 9,0 bar Heating surface: 30,0 m² 1x Steam boiler, exhaust gas heated - 9,0 bar Heating surface: 692,0 m² Year of manufacture: 2006 Manufacturer: Alfa Laval Aalborg A/S Gasvaerksvej 24 9100 Aalborg Kingdom of Denmark |
|
Electric installations |
2x Plants each 450/230 V - 1.250 kVA 2x Plants each 450/230 V - 1.499 kVA 1x Plant 450 V - 200 kVA 1x Plant 24 V - 80 Ah 1x Plant 24 V - 117 Ah |
|
Generators |
2x MAN-B&W 5128/32H main diesel generatorsets each 1.250 kVA at 720 rpm 2x MAN-B&W 6128/32H main diesel generatorsets each 1.499 kVA at 720 rpm |
|
Emergency generator |
1x Diesel generatorset 200 kVA |
|
Number of holds |
6 |
|
Number of hatches |
11x Pontoon type 1,364 x 28,30 m each |
|
Batteries |
1x Battery for UPS radio 117 Ah 1x Battery for start emergency engine 80 Ah |
|
Compressed air receivers |
2x Receivers each 10.000 litres - 30,0 bar 1x Receiver 1.000 litres - 30,0 bar 1x Receiver 100 litres - 30,0 bar 1x Receiver 40 litres - 30,0 bar 1x Receiver 2.000 litres - 7,0 bar |
|
Bow thruster |
1x ABB Zamech Marine controllable pitch propeller - 1.200 kW, forward |
|
Number of holds |
6 |
|
Number of hatch |
11 Dimensions: Hatch 1-11: 12,64 x 28,30 m |
|
Hatch cover type |
Pontoon |
|
Anchor equipment |
3x Anchors weight each 11.100 kg Chain length: 687,50 m Diameter: 81 mm |
|
Crew size |
28 |
|
Manager |
Eurobulk Ltd. 4, Messogiou & Evropis Streets 151 24 Marousi Greece |
|
Registered owner |
Kea Shipowners Ltd. |
|
Latest data adjustment |
05 December 2024 |






